Site selection + feasibility estimates
Discover prime locations near energy infrastructure. Get power demand, cooling loads, water usage, and ±30% cost estimates—before you hire engineers.
Power supply delays have extended construction timelines by 24 to 72 months. Primary markets are gridlocked.
You won't know real costs until you hire an engineering firm. By then, you've already committed to a site.
Cooling loads, water access, tax incentives, land costs—they vary wildly by location. No single source of truth.
Get ±30% feasibility estimates BEFORE you engage consultants. Site discovery, cost modeling, and market intelligence in one platform.
| Rank | Location | Pipeline | Dist | $/Acre | Type | Score |
|---|---|---|---|---|---|---|
| 1 | 🔒 Enterprise Only | 🔒 Locked | 0.8 mi | 🔒 | 🦄 Unicorn | |
| 2 | 🔒 Enterprise Only | 🔒 Locked | 1.2 mi | 🔒 | 🦄 Unicorn | |
| 3 | 🔒 Enterprise Only | 🔒 Locked | 0.5 mi | 🔒 | 🔥 BTM | |
| 4 | 🔒 Enterprise Only | 🔒 Locked | 1.8 mi | 🔒 | 🔥 BTM | |
| 5 | 🔒 Enterprise Only | 🔒 Locked | 2.1 mi | 🔒 | 🔥 BTM |
Configure your GPU cluster, select cooling technology, and get ±30% cost estimates instantly. Power demand, cooling loads, water usage, CapEx, OpEx—all in one calculator.
Stop guessing. Get real numbers for your proforma.
Unlock the CalculatorThe pattern repeats on project after project: developers pick sites based on land and incentives, then discover the power economics don't work. By then, they've burned months and six figures on consultants.
Brokers don't understand power generation. Engineers get involved too late. Nobody's connecting energy infrastructure to site selection at the feasibility stage.
DatacenterScout was built to fix that—connecting pipeline proximity, cooling loads, and ±30% cost estimates before you engage a single consultant.
DatacenterScout was built by engineers who've actually delivered large-scale infrastructure—power plants, industrial facilities, and projects designed to survive the harshest conditions on earth.
We've seen what works and what doesn't. We built the tool we wished existed at the feasibility stage.
Here's what companies pay for site intelligence that still misses energy opportunities:
3-4 months of work. Great for tax incentives and negotiations—but they don't understand power generation or engineering tradeoffs.
2-3 months for top 2-3 sites. Required before you can validate power availability and get utility estimates.
For large projects, vetting the best option takes months. Speed matters—the best sites don't stay available.
DatacenterScout gives you a head start. Identify high-potential markets in minutes—so you bring a targeted shortlist of counties to your brokers and engineering teams, not the other way around.
Lock in 50% off for life. Only available during early access.
Your $99 reserves your Founding Member spot. Once we launch and you receive access, you'll have 30 days to explore the full product. Not what you expected? Full refund, no questions asked.
After launch, service continues at $49/month. Cancel anytime—but your founding rate is only available while you maintain continuous membership. If you cancel, you'll rejoin at standard pricing ($99/month).
Our automated reports get you 80% of the way there. For the other 20%, get expert guidance.
Paid consultation with a feasibility engineer. Review your report, validate assumptions, get answers to technical questions.
Request a ConsultationComprehensive engineering assessment including:
We partner with licensed engineering firms across the US to provide expert support.